[patch 0/2] sched: reduce locking

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

 



Hi,
I've had these patches around for a while, and I'd like to
get rid of them. They could possibly even go in 2.6.13.

I haven't really done performance testing because it is
difficult to get real workloads going that really stress
these things. There are small improvements on things like
tbench on bigger systems, but nothing greatly interesting.

I think on real workloads, things could get more interesting.

Actually, it would be interesting to know how these go on the
_really_ big systems, and whether lock and cacheline contention
in the scheduler is still a problem for them.

--
SUSE Labs, Novell Inc.

Send instant messages to your online friends http://au.messenger.yahoo.com -
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to [email protected]
More majordomo info at  http://vger.kernel.org/majordomo-info.html
Please read the FAQ at  http://www.tux.org/lkml/

[Index of Archives]     [Kernel Newbies]     [Netfilter]     [Bugtraq]     [Photo]     [Gimp]     [Yosemite News]     [MIPS Linux]     [ARM Linux]     [Linux Security]     [Linux RAID]     [Video 4 Linux]     [Linux for the blind]
  Powered by Linux